Property Snagging in Dubai: What to Check Before You Accept Your Keys

The handover is the moment the developer's list of defects becomes your problem or stays theirs. Here is what snagging is, when to book it, and what to look for.

Written by the Neatly operations team · Last reviewed 27 October 2026

The short answer


Timing is everything

  • Before handover acceptance. The ideal moment. Defects are on record before you take the keys.
  • After the developer's fixes: the de-snag. Check the list was actually completed before you close it.
  • Before your warranty period ends. New homes usually come with defect cover for a period after handover. Check your sale agreement for the exact terms, and inspect before it ends.

Room by room

  • Walls, ceilings and floors: cracks, uneven paint, damaged or uneven tiles, gaps in grout and skirting, scratches on wood or stone.
  • Doors and windows: alignment, locks and handles, seals, sliding doors and their tracks, window glass for scratches.
  • Kitchen: cabinet doors and drawers, worktop finish and joints, sealant around the sink, appliances switched on and tested.
  • Bathrooms: water pressure and drainage, sealant and grout, signs of leaks under basins, toilet flush and fixings, ventilation.
  • Electrical: every socket, switch and light working, the distribution board labelled.
  • AC: each unit running and cooling, drainage working, no dripping.
  • Balconies: drainage, railings, tiles and waterproofing around the door.

What comes up most often

  • AC: units that don't cool every room evenly, or drainage that drips.
  • Water: slow drains, weak pressure, and leaks under basins and around showers.
  • Sealant and grout: gaps around baths, showers, sinks and worktops.
  • Finishing: paint touch-ups, scratched glass, chipped tiles, misaligned doors.
  • Balcony doors: seals and drainage that let water in when it rains.

Taking handover of a home you haven't seen

Many Dubai buyers bought off-plan from outside the country. The steps are the same; someone has to be there for you.

  1. Get your handover date from the developer.
  2. Arrange access for your inspector through the developer or your agent.
  3. Receive your report and send the defect list to the developer.
  4. Book a de-snag check to confirm the fixes before you accept.

An honest comparison

Do it yourselfProfessional inspection
CostFreeQuoted per property
TimeSeveral hours on siteOur engineer's time, not yours
What gets caughtWhat's visible to youA trained eye, systematic, room by room
The recordYour own photosA signed, dated, photo-documented report
Abroad?Not possibleReport in your portal

If you're in Dubai and confident, use the checklist above. If you're abroad, short on time, or want a signed report to send the developer, book an inspection.


FAQ

What is snagging?

A detailed inspection of a new home to find defects before you accept it from the developer.

Who pays to fix the snags?

Defects in a new build are usually the developer's responsibility under your sale agreement. Check your contract for the exact terms.

How long does a snagging inspection take?

It depends on the size of the home. Your quote confirms it.

Can I move in before the snags are fixed?

That depends on the developer and your agreement. Getting the list on record before handover is what matters most.

Is a de-snag check necessary?

It's the only way to know the list was actually completed, not just signed off.